Design and production of elevator cages in the skiing center in Sweden

Category
Construction
Builder
Builder - Leitner Ropeways; Customer - Taubane Teknikk I Sweg AB
Project location
Kungsberget and Stöten, Sweden
Project timeframe
Contract was signed in 24-05-2016 finished in 24-10-2016

Construction of frame-panel houses with finishing, roofing, windows and doors. The main indicators:  35 and 12 m.

 

Kungsliften control room 3 x 5m

Kungsliften driving room 4 x 4,95m

Kungsliften low voltage room 3,7 x 6,5m

Stöten driving+low voltage rooms 5 x 5,5 m

Stöten control room 3,1 x 4,2m